Wheeler Peak Campground Rehabilitation Project

Wheeler Peak Campground Rehabilitation Project

Overview

PROJECT OWNER

National Park Service

VALUE

$2,467,164

LOCATION

Great Basin National Park

COMPLETION

October 2020

Description

  • Mill road, demo and replace block restrooms and repair others

  • Demo, replace and repair 37 campsite concrete pads, grill pits and tables

  • Repair and renovate historical rock wall and pave road

 

Canyonlands Culverts & Guardrails

Canyonlands Culverts & Guardrails

Overview

PROJECT OWNER

National Park Service

VALUE

$681,074.58

LOCATION

Canyonlands National Park

COMPLETION

November 2019

Description

  • DB- 5’ X 8’ cement culvert and guardrail system

  • Included specifications for 2 future culverts and crossings

  • Traffic Control

  • Extensive excavation; rip rap and compaction specifications

 

Freeport Avenue Septic Conversion Project

Freeport Avenue Septic Conversion Project

Overview

PROJECT OWNER

Sacramento Area Sewer District

VALUE

$2,242,682

LOCATION

Sacramento, CA

COMPLETION

November 2019

Description

  • Demo and abandon 29 existing septic tanks on private property

  • Installation of 29 grinder pumps and re-routing gravity lateral sewer system

  • Installation of 27 individual 1 1/4” lateral force mains from each grinder to new force main

  • 4600 LF of 3” force main, 280 LF VCP all connected to new and/or existing manholes

 

Path 15 Access Road Repairs

Path 15 Access Road Repairs

Overview

PROJECT OWNER

Western Area Power Administration

VALUE

$2,270,371

LOCATION

Fresno, Shasta-Keswick, Trinity-Lewiston

COMPLETION

December 2017

Description

  • Cut, fill and compact road surfaces

  • Install drivable dips

  • Compaction of sink holes

  • Repair of washouts

 

Ft. Bidwell Rancheria Water Main Replacement

Ft. Bidwell Rancheria Water Main Replacement

Overview

PROJECT OWNER

Fort Bidwell Indian Community

VALUE

$1,632,262

LOCATION

Fort Bidwell, CA

COMPLETION

October 2020

Description

  • Construction of 3850 ft 8” HDPE water main by horizontal drilling

  • 1500 ft. of 6” PVC water main

  • 40 ft. of 8” PVC main by open trench

  • 11 residents hooked up on individual meters

  • All PRVs and vaults, hydrants and connection to existing system

 

Off-System Culvert Repair

Off-System Culvert Repair

Overview

PROJECT OWNER

Town of Paradise

VALUE

$478,901

LOCATION

Paradise, CA

COMPLETION

December 2022

Description

  • Trenching

  • Removal of existing culverts and placement of new culverts

  • Drainage appurtenances including rock slope protection and flared end sections.

  • Paving

 

Dinosaur National Park - Quarry Water Distribution Replacement

Dinosaur National Park - Quarry Water Distribution Replacement

Overview

PROJECT OWNER

National Park Service

VALUE

$681,074

LOCATION

Dinosaur, Colorado

COMPLETION

December 2020

Description

  • Replaced 4,000 of water main and appurtenances

  • ARV’s and other valves

  • 700 square feet of asphalt

 

Newell Community Water District Sewer Replacement

Newell Community Water District Sewer Replacement

Overview

PROJECT OWNER

Newell County Water District

VALUE

$4,571,776

LOCATION

Newell, California

COMPLETION

October 2021

Description

  • Installation of new sewer main

  • Laterials to existing appurtenances

 

USFW- Tehama Colusa Fish Facility Domestic Water System

USFW- Tehama Colusa Fish Facility Domestic Water System

Overview

PROJECT OWNER

Bureau of Reclamation

VALUE

$316,610

LOCATION

Clear Creek, Redding, California

COMPLETION

July 2018

Description

  • Install 30,840 LF of HDPE sewer main to 84 individual home sites

  • Rehabilitation of existing community lift station

  • Installation of new pump stations

  • Project challenges: subsurface conditions; minimizing community access disruption

 

City of Yreka - Main Street Water System Improvements

City of Yreka - Main Street Water System Improvements

Overview

PROJECT OWNER

City of Yreka

VALUE

$4,756,839

LOCATION

Yreka, California

COMPLETION

November 2022

Description

  • Over 11,000 feet of 6” - 16” water main with a combination of HDPE, DI, and C900 pipe

  • Pipe depth ranging from 3.5’ to 8’ deep

  • 121 water services and connections to commercial or residential buildings

  • Approx. 350 pothole locations and utility crossings

  • 24 water main tie ins

  • Daily traffic control on Yreka’s busiest street

 

Big Bend- Walking Bridge

Big Bend- Walking Bridge

Overview

PROJECT OWNER

Big Bend Hot Springs Development

VALUE

$239,732.00

LOCATION

Whitmore, California

COMPLETION

January 2018

Description

  • Removal of existing walking bridge
  • Excavation for new bridge abutments
  • Erect new steel bridge with 80ft span with decking
  • Railings to be installed by owner
 

Dog Island Park -ADA Restroom & Utility Connection

Dog Island Park -ADA Restroom & Utility Connection

Overview

PROJECT OWNER

City of Red Bluff

VALUE

$168,212.00

LOCATION

Red Bluff, California

COMPLETION

October 2017

Description

  • Installation of 17x10' pre-fab concrete structure
  • Installation of new utility connections for water, sewer & electric to existing services
  • Site improvements; new parking spaces, walkways, ADA ramp and drinking fountain
 

Tuolumne Rancheria Sewer Improvement

Tuolumne Rancheria Sewer Improvement

Overview

PROJECT OWNER

Indian Health Services

VALUE

$2,710,673.00

LOCATION

Tuolumne, California

COMPLETION

October 2017

Description

  • Install 30,840 LF of HDPE sewer main to 84 individual home sites
  • Rehabilitation of existing community lift station
  • Installation of new pump stations
  • Project challenges: subsurface conditions; minimizing community access disruption
 

Arches National Park-Moab, UT- Water Tank

Arches National Park-Moab, UT- Water Tank

Overview

PROJECT OWNER

Department of the Interior, National Park Service

VALUE

$386,416.00

LOCATION

Arches National Park- Moab, UT

COMPLETION

October 2017

Description

  • Design build project 
  • Demolition of existing steel water tank
  • Replace with glass fused 30K gallon tank
 

Lakeport Highway 29 Force Main Project

Lakeport Highway 29 Force Main Project

Overview

Project Owner

City of Lakeport

Value

$524,755.53

Location

Lakeport, CA

Completion

May 2017

Description

  • Installation of 790LF of 18" HDPE  790 LF of 12" welded PVC sewer main
  • Horizontal boring
  • Connection to existing sewer
  • During the intertie- required to bypass pump 600GPM of raw sewage to prevent backup
  • Worked within a 4 hour time frame to complete intertie- completed in 1.5 hrs.
 

Livestock Ranch Irrigation System

Livestock Ranch Irrigation System

Overview

PROJECT OWNER

Livestock Ranch 

VALUE

$98,000.00

LOCATION

Cottonwood, Shasta County, CA

COMPLETION

June 2016

Description

tape_red_no_icon.jpg
  • Excavation and installation of fresh water gravity pipeline 
  • Installation of irrigation valves 
  • Backfill of pipe to grade with erosion control 
 

Masingale Residental Driveway

Masingale Residental Driveway

Overview

PROJECT OWNER

Masingale Family

VALUE

$40,000

LOCATION

Millville, CA

COMPLETION

May 2015

Description

  • Demolition and removal of old asphalt
  • Grading and site preparation
  • Asphalt paving and finishing

 

Almanor Ranger District Health & Safety Remediation

Almanor Ranger District Health & Safety Remediation

Overview

PROJECT OWNER

USDA Forest Service

VALUE

$511,355.00

LOCATION

Chester, Plumas County, CA

COMPLETION

September 2016

Description

  • Demolition of building siding and rodent infested areas
  • Replace siding, insulation and all utilities  
  • Painting and finishing of exterior walls  
  • Demolition of two warehouse buildings